Founded in 2003, MAXRAC has grown into one of China’s leading racking manufacturers and global exporters. MAXRAC specializes in high-performance warehouse storage solutions, including pallet racking, mezzanine racking, shelving systems, cantilever racking, radio shuttle systems, and automated storage solutions. Our intelligent racking systems optimize warehouse efficiency and space utilization, catering to modern logistics, e-commerce, and industrial storage needs.

Our dedicated R&D team develops cutting-edge intelligent storage solutions to meet the evolving needs of the logistics and warehousing industry.

Our flexible production capabilities allow us to offer both large-scale manufacturing and customized solutions tailored to our clients' specific storage needs.

MAXRAC's manufacturing facility is equipped with state-of-the-art laser cutting machines, robotic welding systems, automated powder coating lines, and precision testing equipment. This advanced infrastructure ensures superior product quality, consistency, and production efficiency.

With exports spanning over 80 countries, MAXRAC has established a dominant presence in Southeast Asia, Europe, the Middle East, North and South America, Australia, New Zealand, and Belt and Road Initiative countries.

Raised Paltform Mezzanine
The Raised Platform Mezzanine is a revolutionary warehouse storage solution designed to optimize space utilization by creating additional storage levels within an existing footprint. This system is ideal for businesses looking to increase storage capacity without the need for a physical expansion, offering a flexible and scalable alternative to traditional storage methods.
Steel Platform Mezzanine
Steel Platform Mezzanine is made up of column, main beam, sub beam, steel flooring, staircase, handrail, horizontal bracing, back bracing, connecting plate and some accessories.
Steel Floor Mezzanine
Steel Platform Mezzanine is made up of column, main beam, sub beam, steel flooring, staircase, handrail, horizontal bracing, back bracing, connecting plate and some accessories.
| Element | Specification |
| Primary Beams | 90x70x1.8mm steel tubing (Q235 grade) |
| Decking Panels | 3mm checkered steel plate or wire mesh options |
| Support Columns | Adjustable height (50mm increment modules) |
| Safety Railings | 1.1m high with 200mm kickboards (OSHA compliant) |
| Max Span | 6m unsupported |
| Fire Rating | 60-min protection standard |
| Floor Clearance | Min. 3.5m for MHE access |
| Temperature Range | -40°C to +120°C |
| Lead Time | 30 days after deposit |
Material: Constructed from steel, aluminum, or other sturdy materials to ensure strength and durability.
Design: Customizable to fit the specific dimensions and requirements of the building.
Load Capacity: Engineered to support various load capacities depending on the intended use, ranging from light storage to heavy machinery.
Modularity: Often designed as modular systems that can be expanded, reconfigured, or relocated as needed.
Access: Equipped with stairs, ladders, and sometimes lifts for easy access to the mezzanine level.
Safety Features: Our mezzanine includes handrails, guardrails, kickplates, and safety gates to ensure safe operation and compliance with safety regulations.
The first stage is where you prepare the site for the process of installation. Make sure all the obstacles from the place are removed and the site is clean, clear, and safe to work on.
The second stage is where you install the support columns at the marked positions based on the layout plan. It is very important to ensure that the columns are preferably placed and are even aligned and straight. You can use bolts or a base plate system to secure the columns to the foundation perfectly.
After the columns have been secured, the horizontal beams are installed which support the columns, you will need relevant connectors for this installation. You can use brackets or even weld the beams and columns together for a secure connection.
When your structure is ready, it is time to install flooring in your mezzanine. You can choose from the different flooring materials that are relevant to your application requirements.
Placement of accessibility points like adding lifts or stairs to the designated area is then the next step. Make sure to attach the ladders or stairs properly to the mezzanine floor as well as the ground.
After the overall mezzanine floor installation has taken place, the proper inspection of the mezzanine is also important. You need to ensure that the structural integrity of the mezzanine is up to the mark. Check each and every connection and alignment to check the stability of the mezzanine ensuring it meets the safety standards.

| Shipping: | By logistics; by automobile; by train; by shipping; by air. |
| Payment: | L/C; T/T; Paypal; West Union; MoneyGram etc; |

Q: Are you manufacture or trading company?
A: We are manufacture. With over 20 years of experience, we have built a strong international presence, exporting to 80+ countries and collaborating with top-tier distributors worldwide.
Q: Can existing rack systems support these platforms?
A: Requires structural audit – most need independent columns due to load transfer requirements.
Q: What decking is best for pallet jacks?
A: 3mm checkered steel plates (tested for 5,000+ wheel passes).
Q: Are permits required for installation?
A: Yes – we provide stamped engineering drawings for local approvals.
Q: How does this compare to aluminum platforms?
A: 30% higher load capacity and 50% lower lifecycle cost vs. aluminum.
Q: What maintenance is needed?
A: Annual bolt torque checks and corrosion inspections in humid environments.
MAXRAC’s manufacturing facility is equipped with state-of-the-art laser cutting machines, robotic welding systems, automated powder coating lines, and precision testing equipment.